The Middle Anacostia River Crossings Study evaluated existing traffic conditions and assessed improvement options to enhance mobility in the area, including addressing missing interchange movements on the Anacostia Freeway at Pennsylvania Avenue and the Southeast Freeway at Barney Circle. The study also investigated alternative uses of existing lane capacity on the Southeast Freeway between 11th Street and Barney Circle, as well as the potential for increased pedestrian and bicycle access within the study area and along the Anacostia River. A number of short-term and long-term improvements have been developed in this study which include the completion of the 11th Street Bridge ramps to 295, reestablishment of Barney Circle as an actual circle, separation of the interstate (regional) traffic from the local traffic, riverfront access improvements, signage improvements, and pedestrian improvements.
Schedule:
04.15.2005 Submit Final Report
|